products

Polishing Flap Magnetic Floating Ball Switch Water Level Sensor Meter

Basic Information
Place of Origin: china
Brand Name: Sanlo
Certification: ISO9000
Model Number: customize
Minimum Order Quantity: 500
Price: negotiable
Packaging Details: Box
Delivery Time: 30days
Payment Terms: T/T, Western Union
Supply Ability: 5000-10000/day
Detail Information
Product: Flap Float Material: 316L Or 304
Production Time: 30days Medium: Water
Pressure: Customize Temperature: -100-200
High Light:

metal ball float

,

mechanical float


Product Description

 

 

Polishing Flap Magnetic Floating Ball Level Gauge Accessories


 

Video: https://youtu.be/a0EVKb3qcYs

 

 

The float design is not required to be very accurate. According to the medium and medium density design of the two media, the float can basically float on the interface of the two media. Due to the limited inner diameter of the quartz tube, the diameter of the float and the material selection (corrosion resistance and oil resistance) , heat resistance), structure (column, spherical) should be carefully considered in the design.

 

Product :

 

Polishing Flap Magnetic Floating Ball Switch Water Level Sensor Meter Polishing Flap Magnetic Floating Ball Switch Water Level Sensor Meter Polishing Flap Magnetic Floating Ball Switch Water Level Sensor Meter

 

Process step -- Polishing

 

Polishing does not improve the dimensional accuracy or geometric accuracy of the workpiece, but rather for the purpose of obtaining a smooth surface or specular gloss, and sometimes for eliminating gloss (extinction). A polishing wheel is usually used as a polishing tool. The polishing wheel is generally formed by stacking a plurality of layers of canvas, felt or leather, and the two sides are clamped by a metal circular plate, and the rim is coated with a polishing agent uniformly mixed with fine powder abrasive and grease.

 

 

FQA:

 

1.Q:Are you trade company or manufacture?
A:We are manufacture with more than 12 years experience,and the price is the factory price.

2.Q:How to control the quality?
A:We have strict quality by QC team.

3.Q:How long is the delivery time?
A:It is about 5 days after payment for stoct goods,10-15 days for new producing goods.

Contact Details