Market: | OEM | Material: | Copper |
---|---|---|---|
Production Time: | 30days | Shipment: | By DHL/FEDEX/TNT/UPS |
Working: | Lever Switch | Temperature: | -100-200 |
High Light: | copper toilet float ball,stock tank float |
Top quality 103*80 copper float with lever for level switch from china factory with top quality
Video:https://youtu.be/lTT3v90H_1g
The valve flap of the float type check valve has a disc shape and rotates around the rotation shaft of the valve seat passage. Since the valve passage is streamlined, the flow resistance is smaller than that of the butterfly butterfly check valve, and is suitable for low flow rate and flow. Large-caliber occasions that do not change frequently, but are not suitable for pulsating flow, and their sealing performance is not as good as lifting.
Technical Parameters:
Shape | Dimensions ΦA×B×ΦC | Material | Thickness (mm) | Pressure(Mpa) | Morphology | Connection Type |
Φ110×M6 | 304 316L | Polishing/Character | Metric thread | |||
Φ125×M8 | Polishing/Character | |||||
Φ200×M10 | Polishing/Character | |||||
Note:According to customers's specifications,Threaded customization(All specifications of precision float balls) | ||||||
Threaded ball float applies to all kinds of float valve hydraulic controlled valves. |
Float Ball Magnet -- NdFeB
The NdFeB permanent magnet material is a permanent magnet material based on the intermetallic compound Nd2Fe14B. The main components are rare earth elements (Nd), iron (Fe), and boron (B). Among them, the rare earth element is mainly niobium (Nd). In order to obtain different properties, some rare earth metals such as Dy and Pr can be replaced, and iron can also be replaced by other metal parts such as cobalt (Co) and aluminum (Al). The boron content is small, but plays an important role in forming a tetragonal crystal intermetallic compound, so that the compound has high saturation magnetization, high uniaxial anisotropy and high Curie temperature.
FQA:
1.Q:Are you trade company or manufacture?
A:We are manufacture with more than 12 years experience,and the price is the factory price.
2.Q:How to control the quality?
A:We have strict quality by QC team.
3.Q:How long is the delivery time?
A:It is about 5 days after payment for stoct goods,10-15 days for new producing goods.