Product: | Sample Package Float | Material: | Stainless Steel |
---|---|---|---|
Production Time: | 30days | Medium: | Water |
Pressure: | Customize | Temperature: | -100-200 |
High Light: | hollow steel balls,water ball float |
Sample Package Steel Float Ball For Level Controller , Stainless Steel Magnetic Floats
Video: https://youtu.be/o9u62xskiok
Introduction:
The float ball liquid level controller is composed of a float ball and a plunger. It is installed on the top of the container through a connecting flange. The float floats on the liquid surface according to the principle of discharging the liquid volume phase. When the liquid level of the container changes, the float also moves up and down. The dry reed is magnetically attracted to change the position of the liquid level into an electrical signal. The actual position of the liquid is displayed digitally through a display instrument.
Product :
![]() |
![]() |
![]() |
Other types of magnetic float level gauges
Quartz glass tube level gauge and glass tube level gauge are manufactured and used in accordance with mechanical industry standards. The production plant should design and produce according to the liquid, pressure, temperature and environment provided by the user.
Since the main parts of the quartz glass tube level gauge are quartz glass tubes and glass sheets, during transportation, handling and installation, it is not allowed to hit or knock, and should be handled gently. After the quartz glass tube level gauge is installed, when the liquid temperature is very high, do not open the valve immediately. Preheat it for 0.5h. After the quartz glass tube has a certain temperature, slowly open the valve. When the valve opens, open the upper valve slowly After slowly opening the valve, the measured liquid slowly enters the quartz glass tube.
Our Factory:
Our Equipment:
FQA:
1. Q: Are you trade company or manufacture?
A: We are manufacture with more than 12 years experience,and the price is the factory price.
2. Q: How to control the quality?
A: We have strict quality by QC team.
3. Q: How long is the delivery time?
A: It is about 5 days after payment for stoct goods,10-15 days for new producing goods.
4. Q: How to get the sample ?
A: We are glad to send you the free sample.