products

65*90 Magneitc Stainless Steel Float Ball With Long Life Service Time

Basic Information
Place of Origin: china
Brand Name: Sanlo
Certification: ISO9000
Model Number: customize
Minimum Order Quantity: 500
Price: negotiable
Packaging Details: Box
Delivery Time: 30days
Payment Terms: T/T, Western Union
Supply Ability: 5000-10000/day
Detail Information
Product: Magnetic Float Material: 316L
Production Time: 30days Medium: Water
Pressure: Customize Temperature: -100-200
High Light:

hollow steel balls

,

water ball float


Product Description

 

65*90 Magneitc Stainless Steel Float Ball For Level Controller


 

Video: https://youtu.be/o9u62xskiok

 

Introduction:

 

The quartz glass tube interface level gauge is equipped with a color micro-float in the quartz glass tube. The float floats between the two media interfaces and floats up and down with the change of the interface, so that the interface and the liquid level can be visually observed. The actual height can also be used to directly indicate the liquid level of a single medium using a color float as needed.

 

Product :

 

65*90 Magneitc Stainless Steel Float Ball With Long Life Service Time 65*90 Magneitc Stainless Steel Float Ball With Long Life Service Time 65*90 Magneitc Stainless Steel Float Ball With Long Life Service Time

 

 

Other types of magnetic float level gauges


Corrosion-resistant, non-magnetic materials have become a major issue depending on the liquid medium on site. In order to prevent concentrated nitric acid clothing, an aluminum magnetic float level gauge has appeared; in order to prevent hydrochloric acid corrosion, a plastic PP magnetic float liquid level gauge has appeared and the stainless steel pipe is lined with PVC, PFA, FEP, Teflon, FRP, etc. Deal with corrosion from different media.

 

Our Factory:

 

65*90 Magneitc Stainless Steel Float Ball With Long Life Service Time

 

FQA:

 

1.Q:Are you trade company or manufacture?
A:We are manufacture with more than 12 years experience,and the price is the factory price.

2.Q:How to control the quality?
A:We have strict quality by QC team.

3.Q:How long is the delivery time?
A:It is about 5 days after payment for stoct goods,10-15 days for new producing goods.

4.Q:How to get the sample ?
A:We are glad to send you the free sample.

Contact Details